Mine Equipping // Overview
Shafts, Drivages and the Machines That Serve Them.
Rapid shaft sinking and inclined drivages for coal and metal mines, and the winders, ventilation, backfilling, gas monitoring, conveyors and sub-stations that equip them — designed, supplied, installed and commissioned by MMPL.
01 // Sinking & Drivage
Rapid Shaft Sinking and Inclined Drivages
Rapid Shaft Sinking- Completed
- 27 shafts
- Diameter
- Ø5.6 – 7.5m
- Depth
- 180 – 468m
- Progress
- 30m / month
Shaft sinking, deepening and equipping for both metal and coal mines, plus tunnelling. We stabilise shafts tilted by unstable ground through in-house design engineering and geotechnical expertise.
Method & plant
- Hydraulic drilling machines and grab loading
- Multi-deck scaffolding and mechanised winches
- Automatic sinking winders and batching unit
- Ground-water stabilisation and high-capacity pumping
02 // Winders
Winding Engines from 100 to 600 kW
Design, manufacture, supply, installation, commissioning and testing, with VFD and automation.
| Installation | Client | Rating | Scope | Completed |
|---|---|---|---|---|
| Winders conversion (6 locations) | ECL | Steam → electric | Conversion + 9-year maintenance | — |
| Shantikhani | SCCL | 600 kW AC | EPC · headgear to cage | 31-12-2019 |
| Mahagiri | IMFA | 450 kW AC | EPC · skip & cage | 31-12-2019 |
| Balaghat ventilation shaft | MOIL | 250 kW AC | Sinking & winder | 31-08-2019 |
03 // Mine Infrastructure
Everything That Equips a Working Mine
Backfilling, ventilation, gas monitoring, conveyors and power, supplied and commissioned by the same team that sank the shaft.
Mine Back Filling
- Two plants: 100 m³/h and 150 m³/h
- Modular plant in development
Saleable · Acceptable · Workable
Mine Ventilation
- Fans with VVFD drives
- 2 large fans at HCL Kendadih
50 – 750 kW · surface & UG
Gas Monitoring System
- CH4, O2, CO, SOx, NOx
- Temperature, humidity, air velocity
Real-time · alarmed
Belt Networking
- LDCC, HDCC chain conveyors
- Right-angle gallery turns
Metal & coal mines
Electrical Sub-stations
- HT & LT, surface and underground
- Statutory approvals obtained
Design to commissioning
Rapid Inclined Drivages
- 22 inclines, 250–790m
- Road header up to 1,000m / month
Coal & metal