Mine Equipping // Mine Back Filling

Mine Back Filling.

Filling mine voids after ore extraction — our commitment to environmental protection and social sustainability.

Plants
2
Operating
Capacity
100m³/h
Plant 1
Capacity
150m³/h
Plant 2
Next
Modular
In development

01 // Mine Back Filling

Backfill Engineered for Each Orebody

Illustration: backfill plant with silos and pipeline filling a mined-out stopeBackfill
Plant 1
100 m³/h
Plant 2
150 m³/h
Contract
BOO at Mahagiri (IMFA)
In development
Modular plant

A modular backfilling plant is in development for rapid deployment on short-term and specialised projects.

What we study

  • Raw materials for mine filling
  • Grain-size distribution
  • Drainage characteristics
  • Settling properties

Our fill must be

  • Saleable
  • Acceptable
  • Workable

Engineering desk // Raniganj

Planning a Shaft, Drivage or Exploration Programme?

Share the scope with our engineering desk at Raniganj. We respond with a feasibility note, method statement and mobilisation plan.