Verticals // Central Engineering Works
Central Engineering Works.
A state-of-the-art facility at Raniganj where MMPL refurbishes heavy machinery and components, delivering reliability and performance at competitive cost.
Established
1997
Raniganj
Goal
Zero
Breakdowns
Shops
4
Fab · Elec · Engine · Assembly
Maintenance
CMMS
Real-time tracking
01 // Facilities
In-House Facilities
01
Workshops
- Fabrication shop
- Electrical shop
- Engine shop
- Assembly shop
02
Test beds
- Engine test bed
- Hydraulic test bed
03
Manufacturing
- Rock-bolt manufacturing unit
- Drill manufacturing unit
- Heat treatment plant
04
Quality lab
- In-house quality laboratory
- Comprehensive testing
05
Central warehouse
- Automated material tracking
06
Training
- On-site and off-site programmes
- AR/VR training hall (planned)
02 // Services
Fleet Care Beyond the Works
CEW · RaniganjExpert technocrats and quality personnel work round the clock to keep our fleet — and our clients' — running.
Services
- On-site component repair and fleet management
- Computerised Maintenance Management System (CMMS)
- Real-time equipment tracking for zero breakdowns
- Asset digitisation through onboard diagnostics and IIoT
→ // Related